To assist organizations in their decision-making process regarding the installation of a boat washing station, this article lists the fundamental questions to ask.
1. Technical specifications
Consideration of technical parameters ensures environmental compliance, operational performance and project sustainability.
Key points to document
- Water pressure and flow required for the target vessels.
- Access to water: municipal network, direct connection or alternatives (pumps, reservoirs).
- Access to electricity: available capacity, distance to the power supply point and off-grid options.
- Storage capacity and autonomy for mobile stations.
- Selection of station type: fixed, mobile or integrated into a shed.
2. Logistics
The configuration of the terrain and the physical constraints of the site directly influence the smooth running of operations and the effectiveness of preventive measures.
Questions to consider
- Does the site allow the station to be installed near the water?
- Will user traffic be smooth and safe?
- Does the site have any constraints: flood zones, restricted access, heavy traffic?
3. BUDGET PLANNING
A structured financial estimate enables organisations to prepare a realistic budget.
Key points to consider
- Cost of equipment and selected options.
- Installation cost (site preparation, labour, anchoring, connections).
- Annual maintenance and operating costs.
- Potential costs for site relocation or adaptation.
- Available funding programmes (municipal or provincial).
- Usual timeframes for grant approval.
4. OPTIONS, CONFIGURATIONS AND ADDITIONAL EQUIPMENT
The ability to adapt the station to the specific characteristics of each territory is a key factor in the success of the project. It ensures continuous operation and efficiency.
Questions to consider
- Does the installation require additional equipment, such as a SUP inflation station?
- Is surveillance or cameras necessary?
- Choice of decontamination systems: internal, external or combined.
- Options to increase autonomy or treatment capacity during peak periods.
5. Permits, regulations and compliance
A good understanding of regulatory requirements helps avoid delays, simplify approval processes and ensure compliance with local policies.
Key points to consider
- Requirements for completing a form when taking a direct extraction from a body of water.
- Requirements associated with using the municipal network.
- Local or regional regulations applicable to the installation.
6. Operational dimensions
Adequate anticipation of traffic contributes to the longevity of equipment and the satisfaction of the teams responsible for the site.
Questions to consider
- What measures can be taken to limit noise pollution for local residents?
- How should winterization be carried out according to local conditions?
- Which components need to be protected or dismantled at the end of the season?
- What is the anticipated volume of users according to the season?
- What technical support mechanisms will be available after installation?
7. Documentation to be provided to decision-making authorities;
- Detailed technical data sheets
- Installation plans and diagrams
- Equipment specifications (pressure, flow rate, coverage radius)
- Explanatory documents on external and internal washing methods
The goal is to provide a clear, structured, and operational framework for evaluating a project, taking into account technical, logistical, financial, regulatory, and operational considerations.